top of page
Load testing after installation
Some clients request to conduct a static load test after installation to make sure that the components do not fail under load. This is conducted in a controlled environment either on site or on a mock up depending on the situation and requirements by the client.
​
On our side, we will simulate a load test with a dynometer to proof that Akrobat components can hold the load till X KN as required by the client or consultant.





bottom of page